
Headworks Addition Northeast WPCP
This project addresses electrical and control system integration within a wastewater treatment facility. The contractor must coordinate with all trades to place and program equipment such as conduits, controls, power systems, and devices. Detailed adherence to specifications is mandatory. Diagrams serve as guidelines, requiring contractors to ensure precise execution. The work enhances plant operations, boosts system efficiency, and ensures safe, code-compliant installation of technology and power systems within an industrial treatment environment.